The 2026 budget supplied by J&M Management as ratified sets the annual assessment at $1,000 per home across 144 lots, for $144,000 in budgeted assessment income.
2027 amounts are coming soon. Hover over an underlined 2026 figure, or tap or select it with Enter, for a brief explanation. Press Escape or tap elsewhere to dismiss.
Annual assessment per home
| Assessment | 2025 | 2026 | 2027 |
|---|---|---|---|
| Annual amount | $940.00 | The annual assessment rose $60 per home, from $940 to $1,000. | |
| Change from prior year | $0.00 (0%) | The first increase was in 2026; the 2025 assessment was unchanged. |
Budget allocation by year
| Annual budget | 2025 | 2026 | 2027 |
|---|---|---|---|
| Assessment income | $135,360.00 | An extra $60 across 144 lots adds $8,640 in budgeted income. | |
| Administration | $25,688.80 | The $12,034.19 contingency accounts for most of the $12,773.99 increase; its purpose awaits confirmation. | |
| Utilities | $11,016.44 | Irrigation rises $15,380.65; the 2025 electricity allowance is not separately listed in 2026. | |
| Common-area maintenance | $46,710.76 | Snow removal rises $5,000; other maintenance changes offset $116.64. | |
| Operating subtotal | $83,416.00 | Administration, utilities and maintenance together rise $29,628. | |
| Reserve contribution | $51,944.00 | Operating allocations rise $20,988 more than income, leaving $20,988 less allocated to reserves. | |
| Total allocation | $135,360.00 | Operating costs plus planned reserves equal the $144,000 budgeted income. | |
| Unallocated balance | $0.00 | Both budgets allocate all planned income between operating costs and reserves. |
From 2025 to 2026, budgeted income rose $8,640, operating expenses rose $29,628, and the planned reserve contribution fell $20,988.
Selected cost drivers
These amounts are included in the categories above, not additional charges.
| Budget item | 2025 | 2026 | 2027 |
|---|---|---|---|
| Landscaping | $36,260.76 | The annual allowance is nearly unchanged, increasing only $33.36. | |
| Snow removal | $2,000.00 | The allowance rises $5,000; the basis for the increase awaits confirmation. | |
| Irrigation water | $7,336.44 | The 2026 allowance matches the annualized January–October 2025 water expense. |
Administration covers management, insurance, communications, tax return/audit, filings, contingency and reserve-study costs. Utilities include irrigation water and annual backflow testing; the 2025 budget also included electricity. Common-area maintenance covers landscaping, irrigation and common-area repairs, storm-pond/drain work and snow removal.
What reserves mean
Reserves set money aside for future major repairs and replacements, separate from regular operating expenses. Both budget sheets reference the December 2022 reserve study. The newer study was completed in June 2026, after the 2026 budget had been prepared and the January budget meeting held. The expected approach is to use the June 2026 study to inform the 2027 budget, and future studies to inform the following year’s budget rather than routinely revising the current year’s budget. This is a planning approach, not an adopted policy or a decision on 2027 amounts.
Sources and notes
- Budget sources: J&M’s management-supplied 2025 file labeled “APPROVED” and 2026 file labeled “RATIFIED.” The January 16 meeting summary reports 2026 budget approval; J&M also confirmed ratification in its February 9, 2026 email. Keegan confirmed no assessment increase in 2025; the first increase was in 2026.
- How to read the figures: Table amounts are annual budgets, not actual spending, deposits or current balances. The irrigation explanation compares the 2026 budget with actual spending from the October 2025 profit-and-loss report: January–October water expense of $18,930.91, annualized over 12 months, rounds to $22,717.09. This numerical match does not establish why the budget preparer chose that allowance. Operating subtotal equals the three operating categories; total allocation adds reserves. Selected cost drivers are included above. Blank 2027 cells mean not yet available, not zero; any proposed figures will be clearly labeled before approval.
- Reserve information: The June 2026 report was sent to the board on June 15. Current reserve cash and actual transfers await reconciled financial records. The report and its projections are not reproduced pending public-distribution permission. Owner balances, delinquencies and bank-account details are excluded.